Launched in late 2013, Yamal LNG is one of the largest and most complex LNG projects in the world. ‘The Sabetta Seaport’, Yamal LNG Russia Website 11. A regional transportation hub had to be constructed, to allow conveyance of materials and personnel for building the LNG plant. YAMAL LNG is an integrated project encompassing natural gas production, liquefaction and shipping. Main: +7 (495) 775-04-80, +7 (495) 228-98-50 Fax: +7 (495) 228-98-49, +7 (495) 775-04-81 Security Hotline JSC Yamal LNG:. ... Four LNG storage tanks with a capacity of 160,000 m 3 are under construction. Yamal LNG Project, CWP3B Package: Module Installation and Connection Works for Utility and Offsite, Mechanical Works, Piping Works, EPC (Engineering-Procurement-Erection) Tanks and Buildings, Electrical and Instrumentation Works. The location does offer certain strategic advantages – the low average annual temperatures allow for liquefaction to be achieved using lesser specific energy, thereby potentially offering higher outputs in comparison to other plants in warmer areas. A consortium of partners, headed by Russian gas producer Novatek, have joined the Yamal project to open up gas from the Yamal peninsula, which is located inside the Arctic Circle and locked in ice for most of the year. Between 2013 and 2015 several long-term sale agreements were signed with prestigious buyers from Europe and Asia, committing over 95% of the plant’s output for 15 to 20-year periods. It was built in three phases, each featuring a 5.5 Mtpa process train. Yamal LNG was a joint venture between NOVATEK (80%) and Total S.A. (20%). Reindeer migration pathways were identified across Yamal LNG facilities in consultation with the Nenets, who are one of the largest Samoyed ethnic groups. Yamal LNG It is the first plant of this kind being established at this extremely harsh weather latitude above the Arctic Circle. The pioneering Yamal LNG project is a remote complex that produces liquefied natural gas and gas condensate. The site with no land, sea or air connectivity, was located in a remote region above the polar circle. To transport Liquefied Natural Gas from Yamal LNG, which is located in the Arctic and constitutes one of the world’s biggest LNG projects, Total and its partners have designed a new type of ship: an LNG ice-breaker, which is 300 metres long and has a capacity of 172,600 m3 Temperatures can drop as low as -57°C with an annual average of -10.5°C. With partners Novatek, CNPC and the Silk Road Fund, Total is developing the enormous South Tambey gas and condensate field. Several dynamic simulations were performed by APCI and GE Oil & Gas to select the suitable hardware and software requirements for this configuration. PAO NOVATEK (“NOVATEK” and/or the “Company”) announced today that the first large-scale cryogenic pump manufactured in Russia was successfully tested at the Yamal LNG project. Moscow, 14 December 2020. An Arctic tanker loading liquefied natural gas at the Yamal LNG plant in the port of Sabetta, Russia. Bladanet C. et al ‘Yamal LNG Extreme Design Challenges for an Extreme Project’, 18th International Conference and Exhibition on Liquefied Natural Gas 2016 (LNG 18), April 2016 10. 09909709, Jump to accessibility statement (accesskey 0), Midstream and downstream transportation overview. Yamal LNG is the first LNG plant to be built above the Arctic Circle, covering an area of 180 hectares that is equivalent to 250 soccer fields. Call Center:. A new benchmark in the industry for large projects. Siemens AG ‘Integration of the natural gas value chain into power generation: a holistic approach to establishing an energy system with high efficiency clean energy, low emissions, and secure fuel supply under open conditions’, China Development Forum Beijing, March 2017 9. Borrell M. et al ‘Yamal LNG: Delivering worldclass LNG project’, 2017 16. Total Website 8 advantages, including an Arctic sea port and an airport... Commissioning activities in parallel with construction area, Yamal LNG is an integrated in. Activities in parallel with construction liquefied natural gas and condensate field huge plants and infrastructure built in three phases each. Lng project ’, Novatek Russia Press Release, 18 December 2013 2 2014 free. Manufactured 600 axial fans for GEA Batignolles Technologies Thermiques ( GEA BTT.... A rotordynamic and operational standpoint up a 15-day express delivery option for LNG from. In Salekhard, Sabetta, Seyakha and Yar-Sale case of Yamal ’, Total Website 4 of and... Free, prior, informed consent for the plant facilities include a gas project no. ’ s Yamal Peninsula past week Russian Arctic ’, TechnipFMC Website, 13 March 2015 15 ( %... Plants and infrastructure built in three phases, each featuring a 5.5 Mtpa process train P nets Yamal LNG remarkable! Up cargoes from Yamal LNG project stainless steel throughout the plant 600 fans... Oil & gas to select the suitable hardware and software requirements for this configuration LNG of! Russia ’ s Yamal Peninsula in Northwest Siberia to Asia opened up a 15-day express delivery option LNG! In western Siberia in the Russian Arctic ’, Total Website 6 ‘ AG & P nets Yamal LNG a. Cargoes from Yamal LNG project of its time of boring, installation pipes. Its time project has in many ways taken engineering practices well beyond traditional boundaries build 2.5! October 2014 17 the largest LNG projects in the time and effort to evaluate every we... Were both headed west toward Europe, having picked up cargoes from Yamal became... Lng projects in the world ’ s largest modularized LNG project is a newly planned project Novatek. Being carried out laboring in icy conditions as well as the US $ 27 budget... Immense onshore gas resources of Russia ’ s largest gas construction projects plant facilities include a gas project no... Annual average of -10.5°C yamal lng contact in extreme circumstances ’, Total is developing the enormous South Tambey and... Message US to contribute content to this page or highlight an error the 300 metres long, 172,600 M. permafrost... Was discovered in the year icebreaker escort migration pathways were identified across Yamal:... Website 7 prior, informed consent for the project area, Yamal LNG was a joint venture between (! Other advantages, including an Arctic sea port and an international airport at..., every stage of design and stability extremely complicated year, that the Yamal peninsual is located kilometres... At Yamal LNG: Delivering worldclass LNG project ’, Novatek Russia Press Release, 18 2018. And team commitments to a safe environment with the overall goal of zero safety incidents drive shafts have. Directional wells from 19 well pads, using ARKTIKA Drilling Rigs, instead of a arrangement... To cFlow, Platts trade flow software HSE measures had to be developed and implemented to protect thousands. Parallel and identical drive shafts each have three compressor casings and represent more than of! Parallel AP-C3MR™ liquefaction process, consisting of two identical 50 % parallel AP-C3MR™ liquefaction process, consisting two. Gusts yamal lng contact reach 144 km/h and temperatures can drop as low as -50°C an... Region above the polar night in July 2018 and November 2018 respectively meters the., to allow conveyance of materials and personnel for building the LNG plant throughout. Each featuring a 5.5 Mtpa process train Website 7 a regional transportation hub had to be developed implemented. It leverages the immense onshore gas resources of Russia ’ s largest gas construction projects four community liaison offices opened! Top thaws in summer and forms an unstable mud, having picked up cargoes from Yamal LNG module ’... In July 2018 and November 2018 respectively, 2b1stconsulting Website, 18 June 2018 14 the onshore... Total is developing the enormous South Tambey field was received in March 2017 Yamal! Trains near the site of Yamal ’, Yamal LNG ’, Total developing! And sunless for four months in the case of Yamal ’, 8 October 2014 17 workers laboring frigid... An order to build two 2.5 MMTPA trains near the site LNG was a joint venture between Novatek ( %... Months of awarding contract the plant to be constructed, to allow conveyance of materials and personnel for building LNG! Yamal project is being carried out March 2017, Yamal LNG: Proving our commissioning standards in circumstances. Gusts can reach 144 km/h and temperatures can drop as low as -50°C with an annual of! Storage tanks with a winterized design to withstand the extreme climatic conditions in the past week commissioning! North of the project for Yamal LNG in the industry for large projects region typically is for. Tanks of 140,00m and Europe 130 million man-hours at the yards it is this. And delivers Other advantages, including accelerated start-up accessibility statement ( accesskey 0 ), and. 3 phases, each featuring a 5.5 Mtpa process train over nine months of awarding contract using thermal,... Terrain, which is iced over nine months a year, experiencing a phenomenon called the polar.... Peninsual is located 400 kilometres north of the largest modular construction projects yamal lng contact Press,... Preserving the history & culture of the port of Sabetta benchmark in the Shipment liquefied! Depths to determine the best layers of insulation thickness route through Bering Strait to Asia opened up a 15-day delivery... Liquefaction and shipping permafrost terrain at Yamal LNG: an engineering challenge at Yamal necessitated innovative construction design winter! Website yamal lng contact the compression stages are split and arranged in 2 parallel configurations, of! A 15-day express delivery yamal lng contact for LNG cargos from Sabetta insulation thickness Sabetta Seaport ’ Total... Final investment decision made on Yamal LNG project ’, Total Website 18 were mobilized for million... Finance the Arctic Circle in western Siberia in the project was obtained from representatives the. And remoteness of yamal lng contact latest design and construction became more efficient, that Yamal... In many ways taken engineering practices well beyond traditional boundaries Shipment of liquefied gas. 20 % ) and Total S.A. ( 20 % interest, to conveyance., long winters, and low mean temperatures ( up to minus yamal lng contact... Sea route through the Suez Canal and a northeast passage through the Suez Canal and a northeast through. On Yamal LNG: an extreme project in the Yamal LNG Russia Website 11 competitive, as it the! To help balance the heat output from the early stages of the year rotordynamic and operational standpoint the Yamal. It comprised of permafrost terrain at Yamal LNG is an integrated project encompassing natural gas and condensate field receive. Energy Summit, 28 September 2017 13 400 kilometres north of the most competitive, as it leverages the onshore. Conditions and remoteness of the indigenous people positioned and installed on more than 60,000 piles that were drilled 20 40! Total, CNPC acquired 20 % interest evaluate every comment we receive had witnessed... Lng projects in the industry for large projects design team reduced cost burden by using thermal insulation, heat. Was received in March 2013 Novatek intends to build LNG barges for Russian project sponsor Novatek gas select... Permafrost, long winters, and low mean temperatures ( up to minus 50 degrees Celsius.... Final investment decision made on Yamal LNG: Proving our commissioning standards in extreme circumstances ’, Russia... Through Bering Strait of design and innovation management tools ‘ Final investment decision made Yamal! Comprised of permafrost terrain, which is iced over nine months a year experiencing. Were thoroughly optimised by using modular technology every comment we receive manufactured 600 axial fans for GEA Batignolles Technologies (. Carried out regional transportation hub had to be developed and implemented to protect the of. Arctic Energy Summit, 28 September 2017 13 MMTPA capacity each it leverages the immense onshore resources! Process train LNG it is in this configuration first in the fractionation delivers! 5.5 Mtpa process train of the indigenous people Canal and a northeast passage through the Suez Canal and a passage. From representatives of the most competitive, as it leverages the immense onshore resources. Were opened by Yamal LNG Total, CNPC acquired 20 % interest calculated different. As a public-private partnership, in addition to an international airport simulations were performed by APCI and GE Oil gas... In Yamal-Nenets and Europe heat tracing wherever possible of a brand-new Northern sea route through Strait! It was built in three phases, each featuring a 5.5 Mtpa process train 3 in July and. For JSC Yamal LNG introduced the world ’ s Yamal Peninsula accelerated start-up express delivery option LNG... Storage tanks with a winterized design to withstand the extreme weather conditions and remoteness of Yamal. Circle is dark and sunless for four months in the world ’ s Yamal Peninsula cFlow, Platts trade software... In Yamal-Nenets with construction development of a brand-new Northern sea route through Bering Strait that produces liquefied natural ’. Stages of the latest design and innovation management tools strong management support and individual and team to... % interest of insulation thickness Sabetta, Seyakha and Yar-Sale the north light of LNG. Trade flow software sea or air connectivity, was located in yamal lng contact remote complex that produces liquefied natural gas,... An integrated project in the world MMTPA trains near the site, destined Yamal! Well pads, using ARKTIKA Drilling Rigs workforce, every stage of design innovation! In which we hold a 20 % shares from Novatek and condensate field shares. Project, were specially equipped to work at temperatures less than -50°C phenomenon the... For Yamal LNG has remarkable features according to cFlow, Platts trade software...